SCM阻尼弹簧j9集团|j9国际站官网安装说明
SCM Damping shock absorber Installation instructions
安装前,请确认淞江集团橡胶弹簧j9集团|j9国际站官网的型号和规格是否正确。
Before installation,make sure the model and the specification are correct.
安装说明
Installation guide
所需工具:M10、M12、M14、M16、M20开口扳手。
Required tools:M10、M12、M14、M16、M20 open wrenches.
检查附件是否齐全,弹簧j9集团|j9国际站官网是否有缺陷或破损。(如图1)
Check the isolator and other accessories see if they are all completely or having any defects.(Fig 1)
将弹簧j9集团|j9国际站官网放到设备的安装位置。(如图2)
Place the isolator on the correct installation position.(Fig 2)
锁紧螺母和垫片,确保设备和弹簧j9集团|j9国际站官网固定到位。(如图3)
Fasten the nuts and washers to ensure the equipment feet holes are fixed to the isolator.(Fig 3)
安装后请检查弹簧下压量,如弹簧压到底,则表示荷重不足,没有减震效果。应该更换较大荷重的弹簧j9集团|j9国际站官网型号,并请于本公司业务人员联系。
After the adjustment,check the press amount of the spring.If it appears with insufficient loading,please replace with bigger loading by contacting our staff.
安装时 请注意安全。
Be cautious during the installation.
SCM型弹簧j9集团|j9国际站官网实物:
SCM type shock absorber parameter table:
SCM型弹簧j9集团|j9国际站官网结构图:
SCM type shock absorber Structure drawing:
SCM型弹簧j9集团|j9国际站官网参数表:
SCM type shock absorber parameter table:
型号 Type |
最大载荷 Optimum load(kg) |
外形尺寸 Dimensions(mm) | ||||||
H | D | L1 | L2 | d | d1 | |||
SCM-10 | 10 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-20 | 20 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-30 | 30 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-40 | 40 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-60 | 60 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-80 | 80 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-120 | 120 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-160 | 160 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-240 | 240 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-320 | 320 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-480 | 480 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-640 | 640 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-820 | 820 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1000 | 1000 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1280 | 1280 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1500 | 1500 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-2000 | 2000 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-2700 | 2700 | 160 | 320 | 192 | 240 | 20 | / | |
SCM-3500 | 3500 | 160 | 320 | 192 | 240 | 20 | / | |
SCM-4800 | 4800 | 160 | 320 | 192 | 240 | 20 | / |
保养须知:每月要观察CS固定螺栓是否有松动,保持弹簧j9集团|j9国际站官网安装时弹簧下压挠度是否正常。
Maintenance checking points:remain M12 fixed bolt locked,balance of the base,installation of the isolator,and the deflection of the spring.
图1)检查附件是否齐全,弹簧j9集团|j9国际站官网是否有缺陷或破损。
Fig 1)Check the isolator and other accessories see if they are all completely or having any defects.
图2)将弹簧j9集团|j9国际站官网放到设备的安装位置。
Fig 2)Place the isolator on the correct installation position.
图3)锁紧螺母和垫片,确保设备和弹簧j9集团|j9国际站官网固定到位。
Fig 3)Fasten the nuts and washers to ensure the equipment feet holes are fixed to the isolator.